{"id":9081,"date":"2024-04-08T18:22:09","date_gmt":"2024-04-08T11:22:09","guid":{"rendered":"https:\/\/mayxaydunghanoi.com\/?p=9081"},"modified":"2026-01-27T18:23:29","modified_gmt":"2026-01-27T11:23:29","slug":"construction-of-bored-pile-foundations-for-the-grade-separated-crossing-at-national-highway-21a-and-the-railway-km16894-83","status":"publish","type":"post","link":"https:\/\/mayxaydunghanoi.com\/en\/construction-of-bored-pile-foundations-for-the-grade-separated-crossing-at-national-highway-21a-and-the-railway-km16894-83\/","title":{"rendered":"Construction of Bored Pile Foundations for the Grade-Separated Crossing at National Highway 21A and the Railway \u2013 Km16+894.83"},"content":{"rendered":"

Project: Construction of Bored Pile Foundations for the Grade-Separated Crossing at National Highway 21A and the Railway \u2013 Km16+894.83<\/h2>\n

Quantity:<\/strong> 55 bored piles, diameter D1200mm<\/p>\n

Over 133 years have passed since the name Ha Nam<\/strong> first appeared on the map of Vietnam (20\/10\/1890 \u2013 20\/10\/2023). However, the historical and cultural traditions of the Do Mountain \u2013 Chau River region had already been established thousands of years earlier. Deeply rooted in history and cultural heritage, this land continues to inspire pride and confidence in a prosperous future for Ha Nam Province.<\/p>\n

Today, when mentioning Ha Nam, it is impossible not to recognize its remarkable progress in renovation, integration, and development. One of the most outstanding achievements of this transformation is the modern transportation infrastructure system, featuring an extensive network of national highways, provincial roads, and district roads, along with dozens of bridges crossing the Red River, Day River, and Chau River, as well as key transportation interchanges.<\/p>\n

Investment in the construction of major connecting routes\u2014such as the Liem Son interchange linking National Highway 1A with the Cau Gie \u2013 Ninh Binh Expressway and other national highways\u2014while also improving access to important historical and cultural landmarks such as Tran Thuong Temple and the Tran Temple Historical and Cultural Complex, has brought significant benefits to the local community.<\/p>\n

Hanoi Vietnam Co., Ltd.<\/strong>, one of the leading foundation construction contractors in Vietnam, has been actively participating in these key infrastructure projects. With a highly qualified engineering team and extensive practical experience, we are confident in our ability to contribute effectively to the sustainable development of Ha Nam Province in the years ahead.<\/p>\n

Construction Site Images<\/h3>\n

\"Project<\/p>\n

\"Project<\/p>\n

\"Project<\/p>\n

\"Project<\/p>\n

\"Project<\/p>\n

If you require our construction services, please feel free to contact us.<\/p>\n

\nHotline:<\/strong>
\n0906 261 755 (Mr. Ngoc);
\n0988 601 755 (Mr. Henry);
\n0986 819 020 (Mr. Tung);
\n0963 601 755 (Ms. Anna)\n<\/p>\n

We look forward to serving our valued clients.<\/p>\n","protected":false},"excerpt":{"rendered":"

Project: Construction of Bored Pile Foundations for the Grade-Separated Crossing at National Highway 21A and the Railway \u2013 Km16+894.83 Quantity: 55 bored piles, diameter D1200mm Over 133 years have passed since the name Ha Nam first appeared on the map of Vietnam (20\/10\/1890 \u2013 20\/10\/2023). However, the historical and cultural traditions of the Do Mountain \u2013 Chau River region had already been established thousands of years earlier. Deeply rooted in…<\/p>\n","protected":false},"author":1,"featured_media":4318,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[92],"tags":[],"class_list":["post-9081","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-projects"],"yoast_head":"\nConstruction of Bored Pile Foundations for the Grade-Separated Crossing at National Highway 21A and the Railway \u2013 Km16+894.83 - Hanoi Vietnam Co., Ltd<\/title>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/mayxaydunghanoi.com\/en\/construction-of-bored-pile-foundations-for-the-grade-separated-crossing-at-national-highway-21a-and-the-railway-km16894-83\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Construction of Bored Pile Foundations for the Grade-Separated Crossing at National Highway 21A and the Railway \u2013 Km16+894.83\" \/>\n<meta property=\"og:description\" content=\"Project: Construction of Bored Pile Foundations for the Grade-Separated Crossing at National Highway 21A and the Railway \u2013 Km16+894.83 Quantity: 55 bored piles, diameter D1200mm Over 133 years have passed since the name Ha Nam first appeared on the map of Vietnam (20\/10\/1890 \u2013 20\/10\/2023). However, the historical and cultural traditions of the Do Mountain \u2013 Chau River region had already been established thousands of years earlier. Deeply rooted in...\" \/>\n<meta property=\"og:url\" content=\"https:\/\/mayxaydunghanoi.com\/en\/construction-of-bored-pile-foundations-for-the-grade-separated-crossing-at-national-highway-21a-and-the-railway-km16894-83\/\" \/>\n<meta property=\"og:site_name\" content=\"Hanoi Vietnam Co., Ltd\" \/>\n<meta property=\"article:published_time\" content=\"2024-04-08T11:22:09+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2026-01-27T11:23:29+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/mayxaydunghanoi.com\/wp-content\/uploads\/2024\/04\/thi-cong-coc-khoan-nhoi-vuot-nut-giao-ql21a-voi-duong-sat-km16894-83.jpg\" \/>\n\t<meta property=\"og:image:width\" content=\"600\" \/>\n\t<meta property=\"og:image:height\" content=\"800\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"author\" content=\"hanoivietnam\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"hanoivietnam\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"1 minute\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\/\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\/\/mayxaydunghanoi.com\/en\/construction-of-bored-pile-foundations-for-the-grade-separated-crossing-at-national-highway-21a-and-the-railway-km16894-83\/#article\",\"isPartOf\":{\"@id\":\"https:\/\/mayxaydunghanoi.com\/en\/construction-of-bored-pile-foundations-for-the-grade-separated-crossing-at-national-highway-21a-and-the-railway-km16894-83\/\"},\"author\":{\"name\":\"hanoivietnam\",\"@id\":\"https:\/\/mayxaydunghanoi.com\/en\/#\/schema\/person\/670c4aecaf19a51b8d63e3588557814a\"},\"headline\":\"Construction of Bored Pile Foundations for the Grade-Separated Crossing at National Highway 21A and the Railway \u2013 Km16+894.83\",\"datePublished\":\"2024-04-08T11:22:09+00:00\",\"dateModified\":\"2026-01-27T11:23:29+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\/\/mayxaydunghanoi.com\/en\/construction-of-bored-pile-foundations-for-the-grade-separated-crossing-at-national-highway-21a-and-the-railway-km16894-83\/\"},\"wordCount\":312,\"commentCount\":0,\"publisher\":{\"@id\":\"https:\/\/mayxaydunghanoi.com\/en\/#organization\"},\"image\":{\"@id\":\"https:\/\/mayxaydunghanoi.com\/en\/construction-of-bored-pile-foundations-for-the-grade-separated-crossing-at-national-highway-21a-and-the-railway-km16894-83\/#primaryimage\"},\"thumbnailUrl\":\"https:\/\/mayxaydunghanoi.com\/wp-content\/uploads\/2024\/04\/thi-cong-coc-khoan-nhoi-vuot-nut-giao-ql21a-voi-duong-sat-km16894-83.jpg\",\"articleSection\":[\"Projects\"],\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"CommentAction\",\"name\":\"Comment\",\"target\":[\"https:\/\/mayxaydunghanoi.com\/en\/construction-of-bored-pile-foundations-for-the-grade-separated-crossing-at-national-highway-21a-and-the-railway-km16894-83\/#respond\"]}]},{\"@type\":\"WebPage\",\"@id\":\"https:\/\/mayxaydunghanoi.com\/en\/construction-of-bored-pile-foundations-for-the-grade-separated-crossing-at-national-highway-21a-and-the-railway-km16894-83\/\",\"url\":\"https:\/\/mayxaydunghanoi.com\/en\/construction-of-bored-pile-foundations-for-the-grade-separated-crossing-at-national-highway-21a-and-the-railway-km16894-83\/\",\"name\":\"Construction of Bored Pile Foundations for the Grade-Separated Crossing at National Highway 21A and the Railway \u2013 Km16+894.83 - Hanoi Vietnam Co., Ltd\",\"isPartOf\":{\"@id\":\"https:\/\/mayxaydunghanoi.com\/en\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\/\/mayxaydunghanoi.com\/en\/construction-of-bored-pile-foundations-for-the-grade-separated-crossing-at-national-highway-21a-and-the-railway-km16894-83\/#primaryimage\"},\"image\":{\"@id\":\"https:\/\/mayxaydunghanoi.com\/en\/construction-of-bored-pile-foundations-for-the-grade-separated-crossing-at-national-highway-21a-and-the-railway-km16894-83\/#primaryimage\"},\"thumbnailUrl\":\"https:\/\/mayxaydunghanoi.com\/wp-content\/uploads\/2024\/04\/thi-cong-coc-khoan-nhoi-vuot-nut-giao-ql21a-voi-duong-sat-km16894-83.jpg\",\"datePublished\":\"2024-04-08T11:22:09+00:00\",\"dateModified\":\"2026-01-27T11:23:29+00:00\",\"breadcrumb\":{\"@id\":\"https:\/\/mayxaydunghanoi.com\/en\/construction-of-bored-pile-foundations-for-the-grade-separated-crossing-at-national-highway-21a-and-the-railway-km16894-83\/#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\/\/mayxaydunghanoi.com\/en\/construction-of-bored-pile-foundations-for-the-grade-separated-crossing-at-national-highway-21a-and-the-railway-km16894-83\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/mayxaydunghanoi.com\/en\/construction-of-bored-pile-foundations-for-the-grade-separated-crossing-at-national-highway-21a-and-the-railway-km16894-83\/#primaryimage\",\"url\":\"https:\/\/mayxaydunghanoi.com\/wp-content\/uploads\/2024\/04\/thi-cong-coc-khoan-nhoi-vuot-nut-giao-ql21a-voi-duong-sat-km16894-83.jpg\",\"contentUrl\":\"https:\/\/mayxaydunghanoi.com\/wp-content\/uploads\/2024\/04\/thi-cong-coc-khoan-nhoi-vuot-nut-giao-ql21a-voi-duong-sat-km16894-83.jpg\",\"width\":600,\"height\":800},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\/\/mayxaydunghanoi.com\/en\/construction-of-bored-pile-foundations-for-the-grade-separated-crossing-at-national-highway-21a-and-the-railway-km16894-83\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\/\/mayxaydunghanoi.com\/en\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"C\u00f4ng tr\u00ecnh - D\u1ef1 \u00e1n\",\"item\":\"https:\/\/mayxaydunghanoi.com\/vi\/category\/cong-trinh-du-an\/\"},{\"@type\":\"ListItem\",\"position\":3,\"name\":\"Construction of Bored Pile Foundations for the Grade-Separated Crossing at National Highway 21A and the Railway \u2013 Km16+894.83\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\/\/mayxaydunghanoi.com\/en\/#website\",\"url\":\"https:\/\/mayxaydunghanoi.com\/en\/\",\"name\":\"Hanoi Vietnam Co., Ltd\",\"description\":\"\",\"publisher\":{\"@id\":\"https:\/\/mayxaydunghanoi.com\/en\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\/\/mayxaydunghanoi.com\/en\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Organization\",\"@id\":\"https:\/\/mayxaydunghanoi.com\/en\/#organization\",\"name\":\"Hanoi Vietnam Co., Ltd\",\"url\":\"https:\/\/mayxaydunghanoi.com\/en\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/mayxaydunghanoi.com\/en\/#\/schema\/logo\/image\/\",\"url\":\"https:\/\/mayxaydunghanoi.com\/wp-content\/uploads\/2018\/04\/Logo-mayxaydunghanoi-ok.png\",\"contentUrl\":\"https:\/\/mayxaydunghanoi.com\/wp-content\/uploads\/2018\/04\/Logo-mayxaydunghanoi-ok.png\",\"width\":900,\"height\":900,\"caption\":\"Hanoi Vietnam Co., Ltd\"},\"image\":{\"@id\":\"https:\/\/mayxaydunghanoi.com\/en\/#\/schema\/logo\/image\/\"}},{\"@type\":\"Person\",\"@id\":\"https:\/\/mayxaydunghanoi.com\/en\/#\/schema\/person\/670c4aecaf19a51b8d63e3588557814a\",\"name\":\"hanoivietnam\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/mayxaydunghanoi.com\/en\/#\/schema\/person\/image\/\",\"url\":\"https:\/\/secure.gravatar.com\/avatar\/e029aab6fc13fd3a41cb7f017a6c5d7b03390c73ac57032a95f62f1b97f0ece9?s=96&d=mm&r=g\",\"contentUrl\":\"https:\/\/secure.gravatar.com\/avatar\/e029aab6fc13fd3a41cb7f017a6c5d7b03390c73ac57032a95f62f1b97f0ece9?s=96&d=mm&r=g\",\"caption\":\"hanoivietnam\"},\"url\":\"https:\/\/mayxaydunghanoi.com\/en\/author\/hanoivietnam\/\"}]}<\/script>\n<!-- \/ Yoast SEO Premium plugin. -->","yoast_head_json":{"title":"Construction of Bored Pile Foundations for the Grade-Separated Crossing at National Highway 21A and the Railway \u2013 Km16+894.83 - Hanoi Vietnam Co., Ltd","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/mayxaydunghanoi.com\/en\/construction-of-bored-pile-foundations-for-the-grade-separated-crossing-at-national-highway-21a-and-the-railway-km16894-83\/","og_locale":"en_US","og_type":"article","og_title":"Construction of Bored Pile Foundations for the Grade-Separated Crossing at National Highway 21A and the Railway \u2013 Km16+894.83","og_description":"Project: Construction of Bored Pile Foundations for the Grade-Separated Crossing at National Highway 21A and the Railway \u2013 Km16+894.83 Quantity: 55 bored piles, diameter D1200mm Over 133 years have passed since the name Ha Nam first appeared on the map of Vietnam (20\/10\/1890 \u2013 20\/10\/2023). However, the historical and cultural traditions of the Do Mountain \u2013 Chau River region had already been established thousands of years earlier. Deeply rooted in...","og_url":"https:\/\/mayxaydunghanoi.com\/en\/construction-of-bored-pile-foundations-for-the-grade-separated-crossing-at-national-highway-21a-and-the-railway-km16894-83\/","og_site_name":"Hanoi Vietnam Co., Ltd","article_published_time":"2024-04-08T11:22:09+00:00","article_modified_time":"2026-01-27T11:23:29+00:00","og_image":[{"width":600,"height":800,"url":"https:\/\/mayxaydunghanoi.com\/wp-content\/uploads\/2024\/04\/thi-cong-coc-khoan-nhoi-vuot-nut-giao-ql21a-voi-duong-sat-km16894-83.jpg","type":"image\/jpeg"}],"author":"hanoivietnam","twitter_card":"summary_large_image","twitter_misc":{"Written by":"hanoivietnam","Est. reading time":"1 minute"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/mayxaydunghanoi.com\/en\/construction-of-bored-pile-foundations-for-the-grade-separated-crossing-at-national-highway-21a-and-the-railway-km16894-83\/#article","isPartOf":{"@id":"https:\/\/mayxaydunghanoi.com\/en\/construction-of-bored-pile-foundations-for-the-grade-separated-crossing-at-national-highway-21a-and-the-railway-km16894-83\/"},"author":{"name":"hanoivietnam","@id":"https:\/\/mayxaydunghanoi.com\/en\/#\/schema\/person\/670c4aecaf19a51b8d63e3588557814a"},"headline":"Construction of Bored Pile Foundations for the Grade-Separated Crossing at National Highway 21A and the Railway \u2013 Km16+894.83","datePublished":"2024-04-08T11:22:09+00:00","dateModified":"2026-01-27T11:23:29+00:00","mainEntityOfPage":{"@id":"https:\/\/mayxaydunghanoi.com\/en\/construction-of-bored-pile-foundations-for-the-grade-separated-crossing-at-national-highway-21a-and-the-railway-km16894-83\/"},"wordCount":312,"commentCount":0,"publisher":{"@id":"https:\/\/mayxaydunghanoi.com\/en\/#organization"},"image":{"@id":"https:\/\/mayxaydunghanoi.com\/en\/construction-of-bored-pile-foundations-for-the-grade-separated-crossing-at-national-highway-21a-and-the-railway-km16894-83\/#primaryimage"},"thumbnailUrl":"https:\/\/mayxaydunghanoi.com\/wp-content\/uploads\/2024\/04\/thi-cong-coc-khoan-nhoi-vuot-nut-giao-ql21a-voi-duong-sat-km16894-83.jpg","articleSection":["Projects"],"inLanguage":"en-US","potentialAction":[{"@type":"CommentAction","name":"Comment","target":["https:\/\/mayxaydunghanoi.com\/en\/construction-of-bored-pile-foundations-for-the-grade-separated-crossing-at-national-highway-21a-and-the-railway-km16894-83\/#respond"]}]},{"@type":"WebPage","@id":"https:\/\/mayxaydunghanoi.com\/en\/construction-of-bored-pile-foundations-for-the-grade-separated-crossing-at-national-highway-21a-and-the-railway-km16894-83\/","url":"https:\/\/mayxaydunghanoi.com\/en\/construction-of-bored-pile-foundations-for-the-grade-separated-crossing-at-national-highway-21a-and-the-railway-km16894-83\/","name":"Construction of Bored Pile Foundations for the Grade-Separated Crossing at National Highway 21A and the Railway \u2013 Km16+894.83 - Hanoi Vietnam Co., Ltd","isPartOf":{"@id":"https:\/\/mayxaydunghanoi.com\/en\/#website"},"primaryImageOfPage":{"@id":"https:\/\/mayxaydunghanoi.com\/en\/construction-of-bored-pile-foundations-for-the-grade-separated-crossing-at-national-highway-21a-and-the-railway-km16894-83\/#primaryimage"},"image":{"@id":"https:\/\/mayxaydunghanoi.com\/en\/construction-of-bored-pile-foundations-for-the-grade-separated-crossing-at-national-highway-21a-and-the-railway-km16894-83\/#primaryimage"},"thumbnailUrl":"https:\/\/mayxaydunghanoi.com\/wp-content\/uploads\/2024\/04\/thi-cong-coc-khoan-nhoi-vuot-nut-giao-ql21a-voi-duong-sat-km16894-83.jpg","datePublished":"2024-04-08T11:22:09+00:00","dateModified":"2026-01-27T11:23:29+00:00","breadcrumb":{"@id":"https:\/\/mayxaydunghanoi.com\/en\/construction-of-bored-pile-foundations-for-the-grade-separated-crossing-at-national-highway-21a-and-the-railway-km16894-83\/#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/mayxaydunghanoi.com\/en\/construction-of-bored-pile-foundations-for-the-grade-separated-crossing-at-national-highway-21a-and-the-railway-km16894-83\/"]}]},{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/mayxaydunghanoi.com\/en\/construction-of-bored-pile-foundations-for-the-grade-separated-crossing-at-national-highway-21a-and-the-railway-km16894-83\/#primaryimage","url":"https:\/\/mayxaydunghanoi.com\/wp-content\/uploads\/2024\/04\/thi-cong-coc-khoan-nhoi-vuot-nut-giao-ql21a-voi-duong-sat-km16894-83.jpg","contentUrl":"https:\/\/mayxaydunghanoi.com\/wp-content\/uploads\/2024\/04\/thi-cong-coc-khoan-nhoi-vuot-nut-giao-ql21a-voi-duong-sat-km16894-83.jpg","width":600,"height":800},{"@type":"BreadcrumbList","@id":"https:\/\/mayxaydunghanoi.com\/en\/construction-of-bored-pile-foundations-for-the-grade-separated-crossing-at-national-highway-21a-and-the-railway-km16894-83\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/mayxaydunghanoi.com\/en\/"},{"@type":"ListItem","position":2,"name":"C\u00f4ng tr\u00ecnh - D\u1ef1 \u00e1n","item":"https:\/\/mayxaydunghanoi.com\/vi\/category\/cong-trinh-du-an\/"},{"@type":"ListItem","position":3,"name":"Construction of Bored Pile Foundations for the Grade-Separated Crossing at National Highway 21A and the Railway \u2013 Km16+894.83"}]},{"@type":"WebSite","@id":"https:\/\/mayxaydunghanoi.com\/en\/#website","url":"https:\/\/mayxaydunghanoi.com\/en\/","name":"Hanoi Vietnam Co., Ltd","description":"","publisher":{"@id":"https:\/\/mayxaydunghanoi.com\/en\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/mayxaydunghanoi.com\/en\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Organization","@id":"https:\/\/mayxaydunghanoi.com\/en\/#organization","name":"Hanoi Vietnam Co., Ltd","url":"https:\/\/mayxaydunghanoi.com\/en\/","logo":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/mayxaydunghanoi.com\/en\/#\/schema\/logo\/image\/","url":"https:\/\/mayxaydunghanoi.com\/wp-content\/uploads\/2018\/04\/Logo-mayxaydunghanoi-ok.png","contentUrl":"https:\/\/mayxaydunghanoi.com\/wp-content\/uploads\/2018\/04\/Logo-mayxaydunghanoi-ok.png","width":900,"height":900,"caption":"Hanoi Vietnam Co., Ltd"},"image":{"@id":"https:\/\/mayxaydunghanoi.com\/en\/#\/schema\/logo\/image\/"}},{"@type":"Person","@id":"https:\/\/mayxaydunghanoi.com\/en\/#\/schema\/person\/670c4aecaf19a51b8d63e3588557814a","name":"hanoivietnam","image":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/mayxaydunghanoi.com\/en\/#\/schema\/person\/image\/","url":"https:\/\/secure.gravatar.com\/avatar\/e029aab6fc13fd3a41cb7f017a6c5d7b03390c73ac57032a95f62f1b97f0ece9?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/e029aab6fc13fd3a41cb7f017a6c5d7b03390c73ac57032a95f62f1b97f0ece9?s=96&d=mm&r=g","caption":"hanoivietnam"},"url":"https:\/\/mayxaydunghanoi.com\/en\/author\/hanoivietnam\/"}]}},"_links":{"self":[{"href":"https:\/\/mayxaydunghanoi.com\/en\/wp-json\/wp\/v2\/posts\/9081","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/mayxaydunghanoi.com\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/mayxaydunghanoi.com\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/mayxaydunghanoi.com\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/mayxaydunghanoi.com\/en\/wp-json\/wp\/v2\/comments?post=9081"}],"version-history":[{"count":1,"href":"https:\/\/mayxaydunghanoi.com\/en\/wp-json\/wp\/v2\/posts\/9081\/revisions"}],"predecessor-version":[{"id":9083,"href":"https:\/\/mayxaydunghanoi.com\/en\/wp-json\/wp\/v2\/posts\/9081\/revisions\/9083"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/mayxaydunghanoi.com\/en\/wp-json\/wp\/v2\/media\/4318"}],"wp:attachment":[{"href":"https:\/\/mayxaydunghanoi.com\/en\/wp-json\/wp\/v2\/media?parent=9081"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/mayxaydunghanoi.com\/en\/wp-json\/wp\/v2\/categories?post=9081"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/mayxaydunghanoi.com\/en\/wp-json\/wp\/v2\/tags?post=9081"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}