{"id":9078,"date":"2025-08-15T18:16:59","date_gmt":"2025-08-15T11:16:59","guid":{"rendered":"https:\/\/mayxaydunghanoi.com\/?p=9078"},"modified":"2026-01-27T18:18:33","modified_gmt":"2026-01-27T11:18:33","slug":"overpass-construction-project-at-dai-an-industrial-park-hai-phong","status":"publish","type":"post","link":"https:\/\/mayxaydunghanoi.com\/en\/overpass-construction-project-at-dai-an-industrial-park-hai-phong\/","title":{"rendered":"Overpass Construction Project at Dai An Industrial Park, Hai Phong"},"content":{"rendered":"<h2>Hanoi Vietnam directly executed bored pile drilling works for the Dai An Industrial Park overpass using an 18m casing solution, a 60kW electric vibro hammer, and Indian bentonite slurry.<\/h2>\n<hr \/>\n<p>The Dai An Industrial Park Overpass \u2013 Hai Duong City (now under Hai Phong administrative jurisdiction) is constructed in an area characterized by weak ground conditions and complex stratigraphy, consisting of multiple layers of organic clay, silty clay, and poorly graded soil. Hanoi Vietnam Co., Ltd. was the main contractor directly responsible for the bored pile foundation works of the entire bridge substructure.<\/p>\n<p>To ensure absolute safety, quality, and construction progress, we deployed specialized equipment and tailored technical solutions specifically designed for challenging ground conditions.<\/p>\n<p><iframe loading=\"lazy\" title=\"Bored pile construction for Dai An Overpass \u2013 Hai Duong City \u2013 Hai Phong\" src=\"https:\/\/www.youtube.com\/embed\/Od6XouDW7eQ\" width=\"100%\" height=\"450\" frameborder=\"0\" allowfullscreen=\"allowfullscreen\"><\/iframe><\/p>\n<p>In this article, Hanoi Vietnam provides an in-depth analysis of the technical aspects, operational performance, construction costs, and comparisons with alternative bored pile drilling systems, helping engineers and project owners make informed decisions.<\/p>\n<hr \/>\n<h3>Geotechnical Characteristics of the Dai An Industrial Park Overpass<\/h3>\n<p>The subsurface profile at the project site consists of weak to medium-strength soil layers, interbedded with mud, silty clay, sand mixed with gravel, and poorly compacted fill. The geological stratification can be summarized as follows:<\/p>\n<ul>\n<li><strong>D \u2013 Fill soil:<\/strong> Artificial fill with low bearing capacity, prone to settlement during construction.<\/li>\n<li><strong>B \u2013 Organic silty clay (ML, MH):<\/strong> Extremely weak soil, highly plastic, easily deformable, with a high risk of borehole collapse.<\/li>\n<li><strong>TK1 \u2013 Low plasticity clay (CL):<\/strong> Soft plastic condition with moderate bearing capacity.<\/li>\n<li><strong>TK2 \u2013 Clayey sand (SC):<\/strong> Medium dense structure with organic content, requiring stable slurry control.<\/li>\n<li><strong>Layer 1 \u2013 Sandy soil mixed with silt and gravel (SM, SC, SP):<\/strong> Loose to medium dense, susceptible to erosion during drilling.<\/li>\n<li><strong>Layers 2, 3, 4 \u2013 Clay and silt (MH, ML, CL, CH):<\/strong> Ranging from very soft to semi-stiff, with a high collapse risk at greater depths.<\/li>\n<li><strong>Layers 5, 6, 7 \u2013 Sand, gravel, cobbles (SP, GP):<\/strong> Dense to very dense layers requiring high torque drilling capacity.<\/li>\n<\/ul>\n<p>Given these complex ground conditions, careful calculation and selection of <strong>casing length, slurry stabilization, and drilling equipment capacity<\/strong> were essential.<\/p>\n<hr \/>\n<h3>Construction Equipment: 7055 Drilling Rig and 50-Ton Support Cranes<\/h3>\n<p>To meet the demanding geotechnical conditions, the construction setup included:<\/p>\n<ul>\n<li><strong>7055 Bored Pile Drilling Rig<\/strong>:\n<ul>\n<li>Equipped with a <strong>4-section Kelly bar<\/strong>, each section 19m long, enabling drilling depths up to 60\u201370m when required.<\/li>\n<li>Well-suited for interbedded weak soil and dense gravel layers at depth.<\/li>\n<\/ul>\n<\/li>\n<li><strong>Support cranes<\/strong>:\n<ul>\n<li><strong>IHI CCH500-5 (1995)<\/strong> and <strong>Sumitomo SD507<\/strong>, with a lifting capacity of <strong>50 tons<\/strong>.<\/li>\n<li>Used for handling long casing pipes, steel reinforcement cages, bentonite systems, and heavy equipment on site.<\/li>\n<\/ul>\n<\/li>\n<\/ul>\n<p>The use of dedicated crane support significantly improved casing installation speed and provided flexibility for emergency handling and material logistics.<\/p>\n<hr \/>\n<h3>Use of Indian Bentonite: Borehole Stabilization Solution in Weak Ground<\/h3>\n<p>Due to the presence of organic mud, silty clay, and highly plastic soil layers, the risk of <strong>borehole wall collapse<\/strong> was extremely high without proper slurry control. The use of <strong>Indian bentonite<\/strong> was selected for the following advantages:<\/p>\n<ul>\n<li><strong>Strong gel-forming properties<\/strong> \u2013 creating a stable slurry membrane with excellent sealing performance.<\/li>\n<li><strong>High suspension capacity<\/strong> \u2013 effectively carrying fine sand and drill cuttings during Kelly bar rotation.<\/li>\n<li><strong>Easy treatment and regeneration<\/strong> \u2013 allowing reuse and cost optimization.<\/li>\n<\/ul>\n<p>Note: Bentonite slurry must be mixed at the correct ratio and supported by a complete <strong>sedimentation tank, circulation pump, and filtration system<\/strong> on site to avoid pump blockage and drilling system damage.<\/p>\n<hr \/>\n<h3>Casing Installation from 12m to 18m Using a 60kW Electric Vibro Hammer<\/h3>\n<p>Depending on local ground conditions, casing lengths were applied as follows:<\/p>\n<ul>\n<li><strong>12m casing:<\/strong> Used in relatively stable layers such as TK2 or medium dense sand strata.<\/li>\n<li><strong>18m casing:<\/strong> Applied in zones with <strong>organic mud, highly plastic silt, and weak soils<\/strong> to prevent early borehole collapse before reaching bearing layers.<\/li>\n<\/ul>\n<p>Casing installation equipment included:<\/p>\n<ul>\n<li><strong>Tomen 60kW electric vibro hammer<\/strong>:\n<ul>\n<li>High vibration force with fast casing penetration.<\/li>\n<li>Smooth operation with high positioning accuracy.<\/li>\n<li>Capable of driving casing to depths up to 20m without intermediate welding.<\/li>\n<\/ul>\n<\/li>\n<\/ul>\n<p>The use of an electric vibro hammer significantly reduced manpower requirements, shortened casing installation time, and minimized pile misalignment risks.<\/p>\n<hr \/>\n<h3>Conclusion<\/h3>\n<ul>\n<li>The subsurface conditions at Dai An Industrial Park are complex, consisting of weak soils, organic mud, and dense sand\u2013gravel layers.<\/li>\n<li>The construction solution combining a 7055 drilling rig, Indian bentonite slurry, casing lengths up to 18m, and a Tomen 60kW electric vibro hammer proved highly effective.<\/li>\n<li>50-ton support cranes such as the SD507 and IHI CCH500-5 ensured construction safety and schedule compliance.<\/li>\n<li>Proper technical treatment of weak soil layers was the decisive factor for the project\u2019s success.<\/li>\n<\/ul>\n<hr \/>\n<p><strong>For technical consultation or construction cooperation, please contact:<\/strong><\/p>\n<p><strong>HANOI VIETNAM CO., LTD.<\/strong><br \/>\n<strong>Head Office:<\/strong> No. 35, Lot BT3, Dang Xa 2 New Urban Area, Dang Xa, Gia Lam, Hanoi, Vietnam<br \/>\n<strong>Yard &#038; Workshop:<\/strong> Phu Duc 1 Hamlet, Phu Dong Commune, Gia Lam District, Hanoi, Vietnam<br \/>\n<strong>Website:<\/strong> <a href=\"https:\/\/mayxaydunghanoi.com\/\">https:\/\/mayxaydunghanoi.com<\/a><br \/>\n<strong>Facebook:<\/strong> <a href=\"https:\/\/www.facebook.com\/khoandapcap\">facebook.com\/khoandapcap<\/a><br \/>\n<strong>Hotline:<\/strong> Mr. Henry Noi \u2013 +84 988 601 755<br \/>\n<strong>Email:<\/strong> <a href=\"mailto:hanoi10072017@gmail.com\">hanoi10072017@gmail.com<\/a><\/p>\n<h3>Construction Images \u2013 Dai An Industrial Park Overpass, Hai Phong<\/h3>\n\n    <style>\n        \/* D\u00f9ng !important \u0111\u1ec3 tr\u00e1nh b\u1ecb Theme ghi \u0111\u00e8 *\/\n        .usg-grid { \n            display: grid !important; \n            grid-template-columns: repeat(3, 1fr) !important; \n            gap: 15px !important; \n            margin: 20px 0 !important; \n            width: 100% !important;\n        }\n        .usg-item { \n            position: relative; \n            cursor: pointer; \n            overflow: hidden; \n            border-radius: 8px; \n            aspect-ratio: 4\/3; \n            background: #f0f0f0; \n        }\n        .usg-item img { \n            width: 100% !important; \n            height: 100% !important; \n            object-fit: cover !important; \n            display: block !important; \n            transition: transform 0.3s;\n        }\n        .usg-item:hover img { transform: scale(1.05); }\n\n        \/* Mobile 1 c\u1ed9t *\/\n        @media (max-width: 768px) {\n            .usg-grid { grid-template-columns: 1fr !important; gap: 15px !important; }\n        }\n\n        \/* Lightbox CSS *\/\n        #usg-lightbox {\n            display: none; position: fixed; z-index: 999999; top: 0; left: 0; width: 100%; height: 100%;\n            background: rgba(0,0,0,0.95); align-items: center; justify-content: center; flex-direction: column;\n            backdrop-filter: blur(5px);\n        }\n        #usg-img-wrap { \n            position: relative; max-width: 90%; max-height: 80vh; \n            box-shadow: 0 0 20px rgba(0,0,0,0.5);\n        }\n        #usg-img { \n            max-width: 100%; max-height: 80vh; object-fit: contain; border-radius: 4px; display: block;\n        }\n        #usg-caption { color: #ccc; margin-top: 15px; font-size: 15px; text-align: center; }\n        \n        .usg-btn { \n            position: absolute; color: white; font-size: 40px; cursor: pointer; padding: 20px; \n            user-select: none; top: 50%; transform: translateY(-50%); z-index: 100;\n        }\n        .usg-prev { left: 10px; }\n        .usg-next { right: 10px; }\n        .usg-close { \n            position: absolute; top: 20px; right: 20px; font-size: 40px; color: white; cursor: pointer; z-index: 101; \n        }\n        \n        @media (max-width: 768px) {\n            .usg-btn { background: rgba(255,255,255,0.1); border-radius: 5px; width: 40px; height: 60px; display: flex; align-items: center; justify-content: center; }\n        }\n    <\/style>\n\n    <div class=\"usg-grid\" id=\"usg-gal-17433\">\n                    <div class=\"usg-item\" onclick=\"usgOpen('https:\/\/mayxaydunghanoi.com\/wp-content\/uploads\/2025\/08\/du-an-thi-cong-cau-vuot-khu-cong-nghiep-dai-an-hai-phong-16.jpg', 'usg-gal-17433')\">\n                <img decoding=\"async\" src=\"https:\/\/mayxaydunghanoi.com\/wp-content\/uploads\/2025\/08\/du-an-thi-cong-cau-vuot-khu-cong-nghiep-dai-an-hai-phong-16.jpg\" \n                     alt=\"Project for Renovation and Upgrading of Provincial Road \u0110H60, \u00c2n Thi District (Km0+500 \u2013 Km3+500 Section)\"\n                     data-full=\"https:\/\/mayxaydunghanoi.com\/wp-content\/uploads\/2025\/08\/du-an-thi-cong-cau-vuot-khu-cong-nghiep-dai-an-hai-phong-16.jpg\" \n                     data-cap=\"\"\n                     class=\"usg-data\">\n            <\/div>\n                    <div class=\"usg-item\" onclick=\"usgOpen('https:\/\/mayxaydunghanoi.com\/wp-content\/uploads\/2025\/08\/du-an-thi-cong-cau-vuot-khu-cong-nghiep-dai-an-hai-phong-1.jpg', 'usg-gal-17433')\">\n                <img decoding=\"async\" src=\"https:\/\/mayxaydunghanoi.com\/wp-content\/uploads\/2025\/08\/du-an-thi-cong-cau-vuot-khu-cong-nghiep-dai-an-hai-phong-1.jpg\" \n                     alt=\"Project for Renovation and Upgrading of Provincial Road \u0110H60, \u00c2n Thi District (Km0+500 \u2013 Km3+500 Section)\"\n                     data-full=\"https:\/\/mayxaydunghanoi.com\/wp-content\/uploads\/2025\/08\/du-an-thi-cong-cau-vuot-khu-cong-nghiep-dai-an-hai-phong-1.jpg\" \n                     data-cap=\"\"\n                     class=\"usg-data\">\n            <\/div>\n                    <div class=\"usg-item\" onclick=\"usgOpen('https:\/\/mayxaydunghanoi.com\/wp-content\/uploads\/2025\/08\/du-an-thi-cong-cau-vuot-khu-cong-nghiep-dai-an-hai-phong.jpg', 'usg-gal-17433')\">\n                <img decoding=\"async\" src=\"https:\/\/mayxaydunghanoi.com\/wp-content\/uploads\/2025\/08\/du-an-thi-cong-cau-vuot-khu-cong-nghiep-dai-an-hai-phong.jpg\" \n                     alt=\"Project for Renovation and Upgrading of Provincial Road \u0110H60, \u00c2n Thi District (Km0+500 \u2013 Km3+500 Section)\"\n                     data-full=\"https:\/\/mayxaydunghanoi.com\/wp-content\/uploads\/2025\/08\/du-an-thi-cong-cau-vuot-khu-cong-nghiep-dai-an-hai-phong.jpg\" \n                     data-cap=\"\"\n                     class=\"usg-data\">\n            <\/div>\n                    <div class=\"usg-item\" onclick=\"usgOpen('https:\/\/mayxaydunghanoi.com\/wp-content\/uploads\/2025\/08\/du-an-thi-cong-cau-vuot-khu-cong-nghiep-dai-an-hai-phong-9.jpg', 'usg-gal-17433')\">\n                <img decoding=\"async\" src=\"https:\/\/mayxaydunghanoi.com\/wp-content\/uploads\/2025\/08\/du-an-thi-cong-cau-vuot-khu-cong-nghiep-dai-an-hai-phong-9.jpg\" \n                     alt=\"Project for Renovation and Upgrading of Provincial Road \u0110H60, \u00c2n Thi District (Km0+500 \u2013 Km3+500 Section)\"\n                     data-full=\"https:\/\/mayxaydunghanoi.com\/wp-content\/uploads\/2025\/08\/du-an-thi-cong-cau-vuot-khu-cong-nghiep-dai-an-hai-phong-9.jpg\" \n                     data-cap=\"\"\n                     class=\"usg-data\">\n            <\/div>\n                    <div class=\"usg-item\" onclick=\"usgOpen('https:\/\/mayxaydunghanoi.com\/wp-content\/uploads\/2025\/08\/du-an-thi-cong-cau-vuot-khu-cong-nghiep-dai-an-hai-phong-7.jpg', 'usg-gal-17433')\">\n                <img decoding=\"async\" src=\"https:\/\/mayxaydunghanoi.com\/wp-content\/uploads\/2025\/08\/du-an-thi-cong-cau-vuot-khu-cong-nghiep-dai-an-hai-phong-7.jpg\" \n                     alt=\"Project for Renovation and Upgrading of Provincial Road \u0110H60, \u00c2n Thi District (Km0+500 \u2013 Km3+500 Section)\"\n                     data-full=\"https:\/\/mayxaydunghanoi.com\/wp-content\/uploads\/2025\/08\/du-an-thi-cong-cau-vuot-khu-cong-nghiep-dai-an-hai-phong-7.jpg\" \n                     data-cap=\"\"\n                     class=\"usg-data\">\n            <\/div>\n                    <div class=\"usg-item\" onclick=\"usgOpen('https:\/\/mayxaydunghanoi.com\/wp-content\/uploads\/2025\/08\/du-an-thi-cong-cau-vuot-khu-cong-nghiep-dai-an-hai-phong-6.jpg', 'usg-gal-17433')\">\n                <img decoding=\"async\" src=\"https:\/\/mayxaydunghanoi.com\/wp-content\/uploads\/2025\/08\/du-an-thi-cong-cau-vuot-khu-cong-nghiep-dai-an-hai-phong-6.jpg\" \n                     alt=\"Project for Renovation and Upgrading of Provincial Road \u0110H60, \u00c2n Thi District (Km0+500 \u2013 Km3+500 Section)\"\n                     data-full=\"https:\/\/mayxaydunghanoi.com\/wp-content\/uploads\/2025\/08\/du-an-thi-cong-cau-vuot-khu-cong-nghiep-dai-an-hai-phong-6.jpg\" \n                     data-cap=\"\"\n                     class=\"usg-data\">\n            <\/div>\n                    <div class=\"usg-item\" onclick=\"usgOpen('https:\/\/mayxaydunghanoi.com\/wp-content\/uploads\/2025\/08\/du-an-thi-cong-cau-vuot-khu-cong-nghiep-dai-an-hai-phong-5.jpg', 'usg-gal-17433')\">\n                <img decoding=\"async\" src=\"https:\/\/mayxaydunghanoi.com\/wp-content\/uploads\/2025\/08\/du-an-thi-cong-cau-vuot-khu-cong-nghiep-dai-an-hai-phong-5.jpg\" \n                     alt=\"Project for Renovation and Upgrading of Provincial Road \u0110H60, \u00c2n Thi District (Km0+500 \u2013 Km3+500 Section)\"\n                     data-full=\"https:\/\/mayxaydunghanoi.com\/wp-content\/uploads\/2025\/08\/du-an-thi-cong-cau-vuot-khu-cong-nghiep-dai-an-hai-phong-5.jpg\" \n                     data-cap=\"\"\n                     class=\"usg-data\">\n            <\/div>\n                    <div class=\"usg-item\" onclick=\"usgOpen('https:\/\/mayxaydunghanoi.com\/wp-content\/uploads\/2025\/08\/du-an-thi-cong-cau-vuot-khu-cong-nghiep-dai-an-hai-phong-4.jpg', 'usg-gal-17433')\">\n                <img decoding=\"async\" src=\"https:\/\/mayxaydunghanoi.com\/wp-content\/uploads\/2025\/08\/du-an-thi-cong-cau-vuot-khu-cong-nghiep-dai-an-hai-phong-4.jpg\" \n                     alt=\"Project for Renovation and Upgrading of Provincial Road \u0110H60, \u00c2n Thi District (Km0+500 \u2013 Km3+500 Section)\"\n                     data-full=\"https:\/\/mayxaydunghanoi.com\/wp-content\/uploads\/2025\/08\/du-an-thi-cong-cau-vuot-khu-cong-nghiep-dai-an-hai-phong-4.jpg\" \n                     data-cap=\"\"\n                     class=\"usg-data\">\n            <\/div>\n                    <div class=\"usg-item\" onclick=\"usgOpen('https:\/\/mayxaydunghanoi.com\/wp-content\/uploads\/2025\/08\/du-an-thi-cong-cau-vuot-khu-cong-nghiep-dai-an-hai-phong-3.jpg', 'usg-gal-17433')\">\n                <img decoding=\"async\" src=\"https:\/\/mayxaydunghanoi.com\/wp-content\/uploads\/2025\/08\/du-an-thi-cong-cau-vuot-khu-cong-nghiep-dai-an-hai-phong-3.jpg\" \n                     alt=\"Project for Renovation and Upgrading of Provincial Road \u0110H60, \u00c2n Thi District (Km0+500 \u2013 Km3+500 Section)\"\n                     data-full=\"https:\/\/mayxaydunghanoi.com\/wp-content\/uploads\/2025\/08\/du-an-thi-cong-cau-vuot-khu-cong-nghiep-dai-an-hai-phong-3.jpg\" \n                     data-cap=\"\"\n                     class=\"usg-data\">\n            <\/div>\n                    <div class=\"usg-item\" onclick=\"usgOpen('https:\/\/mayxaydunghanoi.com\/wp-content\/uploads\/2025\/08\/du-an-thi-cong-cau-vuot-khu-cong-nghiep-dai-an-hai-phong-2.jpg', 'usg-gal-17433')\">\n                <img decoding=\"async\" src=\"https:\/\/mayxaydunghanoi.com\/wp-content\/uploads\/2025\/08\/du-an-thi-cong-cau-vuot-khu-cong-nghiep-dai-an-hai-phong-2.jpg\" \n                     alt=\"Project for Renovation and Upgrading of Provincial Road \u0110H60, \u00c2n Thi District (Km0+500 \u2013 Km3+500 Section)\"\n                     data-full=\"https:\/\/mayxaydunghanoi.com\/wp-content\/uploads\/2025\/08\/du-an-thi-cong-cau-vuot-khu-cong-nghiep-dai-an-hai-phong-2.jpg\" \n                     data-cap=\"\"\n                     class=\"usg-data\">\n            <\/div>\n                    <div class=\"usg-item\" onclick=\"usgOpen('https:\/\/mayxaydunghanoi.com\/wp-content\/uploads\/2025\/08\/du-an-thi-cong-cau-vuot-khu-cong-nghiep-dai-an-hai-phong-18.jpg', 'usg-gal-17433')\">\n                <img decoding=\"async\" src=\"https:\/\/mayxaydunghanoi.com\/wp-content\/uploads\/2025\/08\/du-an-thi-cong-cau-vuot-khu-cong-nghiep-dai-an-hai-phong-18.jpg\" \n                     alt=\"Project for Renovation and Upgrading of Provincial Road \u0110H60, \u00c2n Thi District (Km0+500 \u2013 Km3+500 Section)\"\n                     data-full=\"https:\/\/mayxaydunghanoi.com\/wp-content\/uploads\/2025\/08\/du-an-thi-cong-cau-vuot-khu-cong-nghiep-dai-an-hai-phong-18.jpg\" \n                     data-cap=\"\"\n                     class=\"usg-data\">\n            <\/div>\n                    <div class=\"usg-item\" onclick=\"usgOpen('https:\/\/mayxaydunghanoi.com\/wp-content\/uploads\/2025\/08\/du-an-thi-cong-cau-vuot-khu-cong-nghiep-dai-an-hai-phong-17.jpg', 'usg-gal-17433')\">\n                <img decoding=\"async\" src=\"https:\/\/mayxaydunghanoi.com\/wp-content\/uploads\/2025\/08\/du-an-thi-cong-cau-vuot-khu-cong-nghiep-dai-an-hai-phong-17.jpg\" \n                     alt=\"Project for Renovation and Upgrading of Provincial Road \u0110H60, \u00c2n Thi District (Km0+500 \u2013 Km3+500 Section)\"\n                     data-full=\"https:\/\/mayxaydunghanoi.com\/wp-content\/uploads\/2025\/08\/du-an-thi-cong-cau-vuot-khu-cong-nghiep-dai-an-hai-phong-17.jpg\" \n                     data-cap=\"\"\n                     class=\"usg-data\">\n            <\/div>\n                    <div class=\"usg-item\" onclick=\"usgOpen('https:\/\/mayxaydunghanoi.com\/wp-content\/uploads\/2025\/08\/du-an-thi-cong-cau-vuot-khu-cong-nghiep-dai-an-hai-phong-15.jpg', 'usg-gal-17433')\">\n                <img decoding=\"async\" src=\"https:\/\/mayxaydunghanoi.com\/wp-content\/uploads\/2025\/08\/du-an-thi-cong-cau-vuot-khu-cong-nghiep-dai-an-hai-phong-15.jpg\" \n                     alt=\"Project for Renovation and Upgrading of Provincial Road \u0110H60, \u00c2n Thi District (Km0+500 \u2013 Km3+500 Section)\"\n                     data-full=\"https:\/\/mayxaydunghanoi.com\/wp-content\/uploads\/2025\/08\/du-an-thi-cong-cau-vuot-khu-cong-nghiep-dai-an-hai-phong-15.jpg\" \n                     data-cap=\"\"\n                     class=\"usg-data\">\n            <\/div>\n                    <div class=\"usg-item\" onclick=\"usgOpen('https:\/\/mayxaydunghanoi.com\/wp-content\/uploads\/2025\/08\/du-an-thi-cong-cau-vuot-khu-cong-nghiep-dai-an-hai-phong-14.jpg', 'usg-gal-17433')\">\n                <img decoding=\"async\" src=\"https:\/\/mayxaydunghanoi.com\/wp-content\/uploads\/2025\/08\/du-an-thi-cong-cau-vuot-khu-cong-nghiep-dai-an-hai-phong-14.jpg\" \n                     alt=\"Project for Renovation and Upgrading of Provincial Road \u0110H60, \u00c2n Thi District (Km0+500 \u2013 Km3+500 Section)\"\n                     data-full=\"https:\/\/mayxaydunghanoi.com\/wp-content\/uploads\/2025\/08\/du-an-thi-cong-cau-vuot-khu-cong-nghiep-dai-an-hai-phong-14.jpg\" \n                     data-cap=\"\"\n                     class=\"usg-data\">\n            <\/div>\n                    <div class=\"usg-item\" onclick=\"usgOpen('https:\/\/mayxaydunghanoi.com\/wp-content\/uploads\/2025\/08\/du-an-thi-cong-cau-vuot-khu-cong-nghiep-dai-an-hai-phong-13.jpg', 'usg-gal-17433')\">\n                <img decoding=\"async\" src=\"https:\/\/mayxaydunghanoi.com\/wp-content\/uploads\/2025\/08\/du-an-thi-cong-cau-vuot-khu-cong-nghiep-dai-an-hai-phong-13.jpg\" \n                     alt=\"Project for Renovation and Upgrading of Provincial Road \u0110H60, \u00c2n Thi District (Km0+500 \u2013 Km3+500 Section)\"\n                     data-full=\"https:\/\/mayxaydunghanoi.com\/wp-content\/uploads\/2025\/08\/du-an-thi-cong-cau-vuot-khu-cong-nghiep-dai-an-hai-phong-13.jpg\" \n                     data-cap=\"\"\n                     class=\"usg-data\">\n            <\/div>\n                    <div class=\"usg-item\" onclick=\"usgOpen('https:\/\/mayxaydunghanoi.com\/wp-content\/uploads\/2025\/08\/du-an-thi-cong-cau-vuot-khu-cong-nghiep-dai-an-hai-phong-12.jpg', 'usg-gal-17433')\">\n                <img decoding=\"async\" src=\"https:\/\/mayxaydunghanoi.com\/wp-content\/uploads\/2025\/08\/du-an-thi-cong-cau-vuot-khu-cong-nghiep-dai-an-hai-phong-12.jpg\" \n                     alt=\"Project for Renovation and Upgrading of Provincial Road \u0110H60, \u00c2n Thi District (Km0+500 \u2013 Km3+500 Section)\"\n                     data-full=\"https:\/\/mayxaydunghanoi.com\/wp-content\/uploads\/2025\/08\/du-an-thi-cong-cau-vuot-khu-cong-nghiep-dai-an-hai-phong-12.jpg\" \n                     data-cap=\"\"\n                     class=\"usg-data\">\n            <\/div>\n                    <div class=\"usg-item\" onclick=\"usgOpen('https:\/\/mayxaydunghanoi.com\/wp-content\/uploads\/2025\/08\/du-an-thi-cong-cau-vuot-khu-cong-nghiep-dai-an-hai-phong-11.jpg', 'usg-gal-17433')\">\n                <img decoding=\"async\" src=\"https:\/\/mayxaydunghanoi.com\/wp-content\/uploads\/2025\/08\/du-an-thi-cong-cau-vuot-khu-cong-nghiep-dai-an-hai-phong-11.jpg\" \n                     alt=\"Project for Renovation and Upgrading of Provincial Road \u0110H60, \u00c2n Thi District (Km0+500 \u2013 Km3+500 Section)\"\n                     data-full=\"https:\/\/mayxaydunghanoi.com\/wp-content\/uploads\/2025\/08\/du-an-thi-cong-cau-vuot-khu-cong-nghiep-dai-an-hai-phong-11.jpg\" \n                     data-cap=\"\"\n                     class=\"usg-data\">\n            <\/div>\n                    <div class=\"usg-item\" onclick=\"usgOpen('https:\/\/mayxaydunghanoi.com\/wp-content\/uploads\/2025\/08\/du-an-thi-cong-cau-vuot-khu-cong-nghiep-dai-an-hai-phong-10.jpg', 'usg-gal-17433')\">\n                <img decoding=\"async\" src=\"https:\/\/mayxaydunghanoi.com\/wp-content\/uploads\/2025\/08\/du-an-thi-cong-cau-vuot-khu-cong-nghiep-dai-an-hai-phong-10.jpg\" \n                     alt=\"Project for Renovation and Upgrading of Provincial Road \u0110H60, \u00c2n Thi District (Km0+500 \u2013 Km3+500 Section)\"\n                     data-full=\"https:\/\/mayxaydunghanoi.com\/wp-content\/uploads\/2025\/08\/du-an-thi-cong-cau-vuot-khu-cong-nghiep-dai-an-hai-phong-10.jpg\" \n                     data-cap=\"\"\n                     class=\"usg-data\">\n            <\/div>\n            <\/div>\n\n    \n    \n","protected":false},"excerpt":{"rendered":"<p>Hanoi Vietnam directly executed bored pile drilling works for the Dai An Industrial Park overpass using an 18m casing solution, a 60kW electric vibro hammer, and Indian bentonite slurry. The Dai An Industrial Park Overpass \u2013 Hai Duong City (now under Hai Phong administrative jurisdiction) is constructed in an area characterized by weak ground conditions and complex stratigraphy, consisting of multiple layers of organic clay, silty clay, and poorly graded&#8230;<\/p>\n","protected":false},"author":1,"featured_media":8718,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[92],"tags":[],"class_list":["post-9078","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-projects"],"yoast_head":"<!-- This site is optimized with the Yoast SEO Premium plugin v26.1 (Yoast SEO v27.5) - https:\/\/yoast.com\/product\/yoast-seo-premium-wordpress\/ -->\n<title>Overpass Construction Project at Dai An Industrial Park, Hai Phong - Hanoi Vietnam Co., Ltd<\/title>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/mayxaydunghanoi.com\/en\/overpass-construction-project-at-dai-an-industrial-park-hai-phong\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Overpass Construction Project at Dai An Industrial Park, Hai Phong\" \/>\n<meta property=\"og:description\" content=\"Hanoi Vietnam directly executed bored pile drilling works for the Dai An Industrial Park overpass using an 18m casing solution, a 60kW electric vibro hammer, and Indian bentonite slurry. The Dai An Industrial Park Overpass \u2013 Hai Duong City (now under Hai Phong administrative jurisdiction) is constructed in an area characterized by weak ground conditions and complex stratigraphy, consisting of multiple layers of organic clay, silty clay, and poorly graded...\" \/>\n<meta property=\"og:url\" content=\"https:\/\/mayxaydunghanoi.com\/en\/overpass-construction-project-at-dai-an-industrial-park-hai-phong\/\" \/>\n<meta property=\"og:site_name\" content=\"Hanoi Vietnam Co., Ltd\" \/>\n<meta property=\"article:published_time\" content=\"2025-08-15T11:16:59+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2026-01-27T11:18:33+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/mayxaydunghanoi.com\/wp-content\/uploads\/2025\/08\/du-an-thi-cong-cau-vuot-khu-cong-nghiep-dai-an-hai-phong-9.jpg\" \/>\n\t<meta property=\"og:image:width\" content=\"800\" \/>\n\t<meta property=\"og:image:height\" content=\"588\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"author\" content=\"hanoivietnam\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"hanoivietnam\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"4 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\\\/\\\/mayxaydunghanoi.com\\\/en\\\/overpass-construction-project-at-dai-an-industrial-park-hai-phong\\\/#article\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/mayxaydunghanoi.com\\\/en\\\/overpass-construction-project-at-dai-an-industrial-park-hai-phong\\\/\"},\"author\":{\"name\":\"hanoivietnam\",\"@id\":\"https:\\\/\\\/mayxaydunghanoi.com\\\/en\\\/#\\\/schema\\\/person\\\/670c4aecaf19a51b8d63e3588557814a\"},\"headline\":\"Overpass Construction Project at Dai An Industrial Park, Hai Phong\",\"datePublished\":\"2025-08-15T11:16:59+00:00\",\"dateModified\":\"2026-01-27T11:18:33+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/mayxaydunghanoi.com\\\/en\\\/overpass-construction-project-at-dai-an-industrial-park-hai-phong\\\/\"},\"wordCount\":819,\"commentCount\":0,\"publisher\":{\"@id\":\"https:\\\/\\\/mayxaydunghanoi.com\\\/en\\\/#organization\"},\"image\":{\"@id\":\"https:\\\/\\\/mayxaydunghanoi.com\\\/en\\\/overpass-construction-project-at-dai-an-industrial-park-hai-phong\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/mayxaydunghanoi.com\\\/wp-content\\\/uploads\\\/2025\\\/08\\\/du-an-thi-cong-cau-vuot-khu-cong-nghiep-dai-an-hai-phong-9.jpg\",\"articleSection\":[\"Projects\"],\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"CommentAction\",\"name\":\"Comment\",\"target\":[\"https:\\\/\\\/mayxaydunghanoi.com\\\/en\\\/overpass-construction-project-at-dai-an-industrial-park-hai-phong\\\/#respond\"]}]},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/mayxaydunghanoi.com\\\/en\\\/overpass-construction-project-at-dai-an-industrial-park-hai-phong\\\/\",\"url\":\"https:\\\/\\\/mayxaydunghanoi.com\\\/en\\\/overpass-construction-project-at-dai-an-industrial-park-hai-phong\\\/\",\"name\":\"Overpass Construction Project at Dai An Industrial Park, Hai Phong - Hanoi Vietnam Co., Ltd\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/mayxaydunghanoi.com\\\/en\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/mayxaydunghanoi.com\\\/en\\\/overpass-construction-project-at-dai-an-industrial-park-hai-phong\\\/#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/mayxaydunghanoi.com\\\/en\\\/overpass-construction-project-at-dai-an-industrial-park-hai-phong\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/mayxaydunghanoi.com\\\/wp-content\\\/uploads\\\/2025\\\/08\\\/du-an-thi-cong-cau-vuot-khu-cong-nghiep-dai-an-hai-phong-9.jpg\",\"datePublished\":\"2025-08-15T11:16:59+00:00\",\"dateModified\":\"2026-01-27T11:18:33+00:00\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/mayxaydunghanoi.com\\\/en\\\/overpass-construction-project-at-dai-an-industrial-park-hai-phong\\\/#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/mayxaydunghanoi.com\\\/en\\\/overpass-construction-project-at-dai-an-industrial-park-hai-phong\\\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/mayxaydunghanoi.com\\\/en\\\/overpass-construction-project-at-dai-an-industrial-park-hai-phong\\\/#primaryimage\",\"url\":\"https:\\\/\\\/mayxaydunghanoi.com\\\/wp-content\\\/uploads\\\/2025\\\/08\\\/du-an-thi-cong-cau-vuot-khu-cong-nghiep-dai-an-hai-phong-9.jpg\",\"contentUrl\":\"https:\\\/\\\/mayxaydunghanoi.com\\\/wp-content\\\/uploads\\\/2025\\\/08\\\/du-an-thi-cong-cau-vuot-khu-cong-nghiep-dai-an-hai-phong-9.jpg\",\"width\":800,\"height\":588},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/mayxaydunghanoi.com\\\/en\\\/overpass-construction-project-at-dai-an-industrial-park-hai-phong\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/mayxaydunghanoi.com\\\/en\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"C\u00f4ng tr\u00ecnh - D\u1ef1 \u00e1n\",\"item\":\"https:\\\/\\\/mayxaydunghanoi.com\\\/vi\\\/category\\\/cong-trinh-du-an\\\/\"},{\"@type\":\"ListItem\",\"position\":3,\"name\":\"Overpass Construction Project at Dai An Industrial Park, Hai Phong\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/mayxaydunghanoi.com\\\/en\\\/#website\",\"url\":\"https:\\\/\\\/mayxaydunghanoi.com\\\/en\\\/\",\"name\":\"Hanoi Vietnam Co., Ltd\",\"description\":\"\",\"publisher\":{\"@id\":\"https:\\\/\\\/mayxaydunghanoi.com\\\/en\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/mayxaydunghanoi.com\\\/en\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/mayxaydunghanoi.com\\\/en\\\/#organization\",\"name\":\"Hanoi Vietnam Co., Ltd\",\"url\":\"https:\\\/\\\/mayxaydunghanoi.com\\\/en\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/mayxaydunghanoi.com\\\/en\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/mayxaydunghanoi.com\\\/wp-content\\\/uploads\\\/2018\\\/04\\\/Logo-mayxaydunghanoi-ok.png\",\"contentUrl\":\"https:\\\/\\\/mayxaydunghanoi.com\\\/wp-content\\\/uploads\\\/2018\\\/04\\\/Logo-mayxaydunghanoi-ok.png\",\"width\":900,\"height\":900,\"caption\":\"Hanoi Vietnam Co., Ltd\"},\"image\":{\"@id\":\"https:\\\/\\\/mayxaydunghanoi.com\\\/en\\\/#\\\/schema\\\/logo\\\/image\\\/\"}},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/mayxaydunghanoi.com\\\/en\\\/#\\\/schema\\\/person\\\/670c4aecaf19a51b8d63e3588557814a\",\"name\":\"hanoivietnam\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/e029aab6fc13fd3a41cb7f017a6c5d7b03390c73ac57032a95f62f1b97f0ece9?s=96&d=mm&r=g\",\"url\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/e029aab6fc13fd3a41cb7f017a6c5d7b03390c73ac57032a95f62f1b97f0ece9?s=96&d=mm&r=g\",\"contentUrl\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/e029aab6fc13fd3a41cb7f017a6c5d7b03390c73ac57032a95f62f1b97f0ece9?s=96&d=mm&r=g\",\"caption\":\"hanoivietnam\"},\"url\":\"https:\\\/\\\/mayxaydunghanoi.com\\\/en\\\/author\\\/hanoivietnam\\\/\"}]}<\/script>\n<!-- \/ Yoast SEO Premium plugin. -->","yoast_head_json":{"title":"Overpass Construction Project at Dai An Industrial Park, Hai Phong - Hanoi Vietnam Co., Ltd","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/mayxaydunghanoi.com\/en\/overpass-construction-project-at-dai-an-industrial-park-hai-phong\/","og_locale":"en_US","og_type":"article","og_title":"Overpass Construction Project at Dai An Industrial Park, Hai Phong","og_description":"Hanoi Vietnam directly executed bored pile drilling works for the Dai An Industrial Park overpass using an 18m casing solution, a 60kW electric vibro hammer, and Indian bentonite slurry. The Dai An Industrial Park Overpass \u2013 Hai Duong City (now under Hai Phong administrative jurisdiction) is constructed in an area characterized by weak ground conditions and complex stratigraphy, consisting of multiple layers of organic clay, silty clay, and poorly graded...","og_url":"https:\/\/mayxaydunghanoi.com\/en\/overpass-construction-project-at-dai-an-industrial-park-hai-phong\/","og_site_name":"Hanoi Vietnam Co., Ltd","article_published_time":"2025-08-15T11:16:59+00:00","article_modified_time":"2026-01-27T11:18:33+00:00","og_image":[{"width":800,"height":588,"url":"https:\/\/mayxaydunghanoi.com\/wp-content\/uploads\/2025\/08\/du-an-thi-cong-cau-vuot-khu-cong-nghiep-dai-an-hai-phong-9.jpg","type":"image\/jpeg"}],"author":"hanoivietnam","twitter_card":"summary_large_image","twitter_misc":{"Written by":"hanoivietnam","Est. reading time":"4 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/mayxaydunghanoi.com\/en\/overpass-construction-project-at-dai-an-industrial-park-hai-phong\/#article","isPartOf":{"@id":"https:\/\/mayxaydunghanoi.com\/en\/overpass-construction-project-at-dai-an-industrial-park-hai-phong\/"},"author":{"name":"hanoivietnam","@id":"https:\/\/mayxaydunghanoi.com\/en\/#\/schema\/person\/670c4aecaf19a51b8d63e3588557814a"},"headline":"Overpass Construction Project at Dai An Industrial Park, Hai Phong","datePublished":"2025-08-15T11:16:59+00:00","dateModified":"2026-01-27T11:18:33+00:00","mainEntityOfPage":{"@id":"https:\/\/mayxaydunghanoi.com\/en\/overpass-construction-project-at-dai-an-industrial-park-hai-phong\/"},"wordCount":819,"commentCount":0,"publisher":{"@id":"https:\/\/mayxaydunghanoi.com\/en\/#organization"},"image":{"@id":"https:\/\/mayxaydunghanoi.com\/en\/overpass-construction-project-at-dai-an-industrial-park-hai-phong\/#primaryimage"},"thumbnailUrl":"https:\/\/mayxaydunghanoi.com\/wp-content\/uploads\/2025\/08\/du-an-thi-cong-cau-vuot-khu-cong-nghiep-dai-an-hai-phong-9.jpg","articleSection":["Projects"],"inLanguage":"en-US","potentialAction":[{"@type":"CommentAction","name":"Comment","target":["https:\/\/mayxaydunghanoi.com\/en\/overpass-construction-project-at-dai-an-industrial-park-hai-phong\/#respond"]}]},{"@type":"WebPage","@id":"https:\/\/mayxaydunghanoi.com\/en\/overpass-construction-project-at-dai-an-industrial-park-hai-phong\/","url":"https:\/\/mayxaydunghanoi.com\/en\/overpass-construction-project-at-dai-an-industrial-park-hai-phong\/","name":"Overpass Construction Project at Dai An Industrial Park, Hai Phong - Hanoi Vietnam Co., Ltd","isPartOf":{"@id":"https:\/\/mayxaydunghanoi.com\/en\/#website"},"primaryImageOfPage":{"@id":"https:\/\/mayxaydunghanoi.com\/en\/overpass-construction-project-at-dai-an-industrial-park-hai-phong\/#primaryimage"},"image":{"@id":"https:\/\/mayxaydunghanoi.com\/en\/overpass-construction-project-at-dai-an-industrial-park-hai-phong\/#primaryimage"},"thumbnailUrl":"https:\/\/mayxaydunghanoi.com\/wp-content\/uploads\/2025\/08\/du-an-thi-cong-cau-vuot-khu-cong-nghiep-dai-an-hai-phong-9.jpg","datePublished":"2025-08-15T11:16:59+00:00","dateModified":"2026-01-27T11:18:33+00:00","breadcrumb":{"@id":"https:\/\/mayxaydunghanoi.com\/en\/overpass-construction-project-at-dai-an-industrial-park-hai-phong\/#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/mayxaydunghanoi.com\/en\/overpass-construction-project-at-dai-an-industrial-park-hai-phong\/"]}]},{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/mayxaydunghanoi.com\/en\/overpass-construction-project-at-dai-an-industrial-park-hai-phong\/#primaryimage","url":"https:\/\/mayxaydunghanoi.com\/wp-content\/uploads\/2025\/08\/du-an-thi-cong-cau-vuot-khu-cong-nghiep-dai-an-hai-phong-9.jpg","contentUrl":"https:\/\/mayxaydunghanoi.com\/wp-content\/uploads\/2025\/08\/du-an-thi-cong-cau-vuot-khu-cong-nghiep-dai-an-hai-phong-9.jpg","width":800,"height":588},{"@type":"BreadcrumbList","@id":"https:\/\/mayxaydunghanoi.com\/en\/overpass-construction-project-at-dai-an-industrial-park-hai-phong\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/mayxaydunghanoi.com\/en\/"},{"@type":"ListItem","position":2,"name":"C\u00f4ng tr\u00ecnh - D\u1ef1 \u00e1n","item":"https:\/\/mayxaydunghanoi.com\/vi\/category\/cong-trinh-du-an\/"},{"@type":"ListItem","position":3,"name":"Overpass Construction Project at Dai An Industrial Park, Hai Phong"}]},{"@type":"WebSite","@id":"https:\/\/mayxaydunghanoi.com\/en\/#website","url":"https:\/\/mayxaydunghanoi.com\/en\/","name":"Hanoi Vietnam Co., Ltd","description":"","publisher":{"@id":"https:\/\/mayxaydunghanoi.com\/en\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/mayxaydunghanoi.com\/en\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Organization","@id":"https:\/\/mayxaydunghanoi.com\/en\/#organization","name":"Hanoi Vietnam Co., Ltd","url":"https:\/\/mayxaydunghanoi.com\/en\/","logo":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/mayxaydunghanoi.com\/en\/#\/schema\/logo\/image\/","url":"https:\/\/mayxaydunghanoi.com\/wp-content\/uploads\/2018\/04\/Logo-mayxaydunghanoi-ok.png","contentUrl":"https:\/\/mayxaydunghanoi.com\/wp-content\/uploads\/2018\/04\/Logo-mayxaydunghanoi-ok.png","width":900,"height":900,"caption":"Hanoi Vietnam Co., Ltd"},"image":{"@id":"https:\/\/mayxaydunghanoi.com\/en\/#\/schema\/logo\/image\/"}},{"@type":"Person","@id":"https:\/\/mayxaydunghanoi.com\/en\/#\/schema\/person\/670c4aecaf19a51b8d63e3588557814a","name":"hanoivietnam","image":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/secure.gravatar.com\/avatar\/e029aab6fc13fd3a41cb7f017a6c5d7b03390c73ac57032a95f62f1b97f0ece9?s=96&d=mm&r=g","url":"https:\/\/secure.gravatar.com\/avatar\/e029aab6fc13fd3a41cb7f017a6c5d7b03390c73ac57032a95f62f1b97f0ece9?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/e029aab6fc13fd3a41cb7f017a6c5d7b03390c73ac57032a95f62f1b97f0ece9?s=96&d=mm&r=g","caption":"hanoivietnam"},"url":"https:\/\/mayxaydunghanoi.com\/en\/author\/hanoivietnam\/"}]}},"_links":{"self":[{"href":"https:\/\/mayxaydunghanoi.com\/en\/wp-json\/wp\/v2\/posts\/9078","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/mayxaydunghanoi.com\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/mayxaydunghanoi.com\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/mayxaydunghanoi.com\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/mayxaydunghanoi.com\/en\/wp-json\/wp\/v2\/comments?post=9078"}],"version-history":[{"count":1,"href":"https:\/\/mayxaydunghanoi.com\/en\/wp-json\/wp\/v2\/posts\/9078\/revisions"}],"predecessor-version":[{"id":9080,"href":"https:\/\/mayxaydunghanoi.com\/en\/wp-json\/wp\/v2\/posts\/9078\/revisions\/9080"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/mayxaydunghanoi.com\/en\/wp-json\/wp\/v2\/media\/8718"}],"wp:attachment":[{"href":"https:\/\/mayxaydunghanoi.com\/en\/wp-json\/wp\/v2\/media?parent=9078"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/mayxaydunghanoi.com\/en\/wp-json\/wp\/v2\/categories?post=9078"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/mayxaydunghanoi.com\/en\/wp-json\/wp\/v2\/tags?post=9078"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}