{"id":8849,"date":"2025-09-10T09:00:55","date_gmt":"2025-09-10T02:00:55","guid":{"rendered":"https:\/\/mayxaydunghanoi.com\/khoan-coc-nhoi-du-an-phap-van-cau-gie-voi-duong-vanh-dai-3\/"},"modified":"2025-12-25T08:26:09","modified_gmt":"2025-12-25T01:26:09","slug":"bored-pile-drilling-for-the-phap-van-cau-gie-project-at-ring-road-3","status":"publish","type":"post","link":"https:\/\/mayxaydunghanoi.com\/en\/bored-pile-drilling-for-the-phap-van-cau-gie-project-at-ring-road-3\/","title":{"rendered":"Bored Pile Drilling for the Phap Van \u2013 Cau Gie Project at Ring Road 3"},"content":{"rendered":"
The project to construct the connecting road between the Phap Van \u2013 Cau Gie Expressway and Ring Road 3 is a key infrastructure project with a total investment exceeding VND 3,200 billion, playing a crucial role in reducing traffic congestion at the southern gateway of Hanoi.<\/p>\n
In this article, Hanoi Vietnam provides an in-depth analysis of technical aspects, practical performance, operational costs, and comparisons with other equipment solutions, thereby assisting engineers and project owners in making informed decisions.<\/p>\n
The connecting route between the Phap Van \u2013 Cau Gie Expressway and Ring Road 3 is not only a major transportation project but also a critical solution to relieve congestion at Hanoi\u2019s southern gateway. With a total investment of over VND 3,200 billion, the project requires highly robust foundation construction methods to ensure quality, progress, and long-term operational performance.<\/p>\n