{"id":8844,"date":"2025-12-25T08:19:25","date_gmt":"2025-12-25T01:19:25","guid":{"rendered":"https:\/\/mayxaydunghanoi.com\/thai-binh-river-overpass-bridge-construction-project-ckn-d1200-d1500\/"},"modified":"2025-12-25T08:20:24","modified_gmt":"2025-12-25T01:20:24","slug":"thai-binh-river-overpass-bridge-construction-project-ckn-d1200-d1500","status":"publish","type":"post","link":"https:\/\/mayxaydunghanoi.com\/en\/thai-binh-river-overpass-bridge-construction-project-ckn-d1200-d1500\/","title":{"rendered":"Thai Binh River Overpass Bridge Construction Project \u2013 CKN D1200, D1500"},"content":{"rendered":"

\nThe Thai Binh River overpass bridge project utilizes bored piles with diameters D1200\u2013D1500 and a drilling depth of up to 70 meters, connecting key strategic transportation routes of Hai Duong Province.
\n<\/h2>\n

In the context of transportation infrastructure development in Vietnam\u2019s Northern Coastal Region, the Thai Binh River overpass plays a strategically important role. The route not only connects the districts of Binh Giang, Thanh Mien, Ninh Giang, Tu Ky, and Thanh Ha, but also links directly to the Hanoi \u2013 Hai Phong Expressway and National Highway 37. This significantly expands the transportation network between the southeastern districts of Hai Duong Province and neighboring provinces.<\/p>\n