{"id":8817,"date":"2025-10-08T15:15:08","date_gmt":"2025-10-08T08:15:08","guid":{"rendered":"https:\/\/mayxaydunghanoi.com\/du-an-duong-day-500-kv-nmnd-nam-dinh-i-pho-noi\/"},"modified":"2025-12-15T19:40:13","modified_gmt":"2025-12-15T12:40:13","slug":"du-an-duong-day-500-kv-nmnd-nam-dinh-i-pho-noi","status":"publish","type":"post","link":"https:\/\/mayxaydunghanoi.com\/en\/du-an-duong-day-500-kv-nmnd-nam-dinh-i-pho-noi\/","title":{"rendered":"D\u1ef1 \u00e1n \u0111\u01b0\u1eddng d\u00e2y 500 kV NMN\u0110 Nam \u0110\u1ecbnh I \u2013 Ph\u1ed1 N\u1ed1i"},"content":{"rendered":"
The Nam Dinh I \u2013 Pho Noi 500 kV transmission line is one of Vietnam\u2019s key national energy infrastructure projects, implemented at an accelerated pace to promptly deliver large power capacity from the North Central region to the main load centers in the North. The project not only relieves congestion and prevents overloading<\/strong> of existing 500 kV lines, but also enhances power supply reliability<\/strong>, meeting the requirements of socio-economic development and national energy security.<\/p>\n In this article, Hanoi Vietnam analyzes the geological characteristics of the Thai Binh area\u2014one of the most critical sections of the route\u2014and introduces the foundation construction solution for transmission line towers<\/strong> executed by our company, utilizing modern equipment and construction methods suitable for weak soil conditions.<\/p>\n The construction area lies within the coastal zone of the Red River Delta, characterized by complex geology, weak soils, and high groundwater levels<\/strong>. Based on field investigations, the soil stratification is as follows:<\/p>\n This geological structure requires contractors to select equipment with strong penetration capacity and excellent pile stability<\/strong>, while also controlling vibrations to minimize impacts on nearby residential areas.<\/p>\n After a detailed assessment of subsurface conditions and construction constraints, Hanoi Vietnam Co., Ltd.<\/strong> selected a 50-ton base machine equipped with a 24-meter leader system combined with a DD45 Diesel hammer<\/strong> for tower foundation pile installation.<\/p>\n This equipment configuration was chosen for its adaptability to weak soils, capable of handling soft clay and silty sand without causing borehole collapse.<\/p>\n Thanks to this combination, the project was executed on schedule, reducing site preparation time and shortening the construction cycle for each foundation.<\/p>\n Under weak soil and high groundwater conditions, the construction team:<\/p>\n Through strict technical and safety management, tower foundations were completed on time with quality fully meeting standards<\/strong>, earning high praise from the project owner and management board.<\/p>\n Completion of the Nam Dinh I \u2013 Pho Noi 500 kV transmission line enables:<\/p>\n The rapid completion progress reflects strong governmental commitment and exceptional efforts by construction units, including the significant contribution of Hanoi Vietnam\u2019s engineering team<\/strong>.<\/p>\n The Nam Dinh I \u2013 Pho Noi 500 kV transmission line project is a clear demonstration of the fast, safe, and precise construction capability<\/strong> of Hanoi Vietnam Co., Ltd.<\/strong> under complex geological conditions. With a comprehensive equipment system, extensive experience in weak ground treatment, and large-scale pile construction expertise, we remain committed to supporting key national energy and infrastructure projects across Vietnam.<\/p>\n For further information, please contact:<\/strong>
\nGeological Characteristics of the Thai Binh Area \u2013 A Major Challenge for 500 kV Tower Foundation Construction<\/h3>\n
\n
\nConstruction Solution Selected by Hanoi Vietnam: Efficiency \u2013 Safety \u2013 Schedule Compliance<\/h3>\n
1. Advantages of the 50-ton Base Machine \u2013 DD45 Diesel Hammer Combination<\/h4>\n
\n
2. Optimizing Productivity and Construction Safety<\/h4>\n
\n
\nSignificance of the Project for the Northern Power Transmission System<\/h3>\n
\n
\n<\/span>Conclusion<\/span><\/h3>\n
\n
\n\ud83c\udf0d Website:<\/strong> https:\/\/mayxaydunghanoi.com
\n<\/a>
\n\ud83d\udcf2 Facebook:<\/strong> https:\/\/www.facebook.com\/khoandapcap
\n<\/a>
\n\ud83d\udcde Call:<\/strong> Mr. Dong Sai Gon \u2013 +84 842 601 755<\/em>
\n\ud83d\udce9 Email:<\/strong> hanoi.trandong@gmail.com
\n<\/a><\/em><\/p>\nProject Images \u2013 Nam Dinh I \u2013 Pho Noi 500 kV Transmission Line<\/h3>\n\n \n