Construction of Bored Pile Foundations for the Grade-Separated Crossing at National Highway 21A and the Railway – Km16+894.83

Project: Construction of Bored Pile Foundations for the Grade-Separated Crossing at National Highway 21A and the Railway – Km16+894.83

Quantity: 55 bored piles, diameter D1200mm

Over 133 years have passed since the name Ha Nam first appeared on the map of Vietnam (20/10/1890 – 20/10/2023). However, the historical and cultural traditions of the Do Mountain – Chau River region had already been established thousands of years earlier. Deeply rooted in history and cultural heritage, this land continues to inspire pride and confidence in a prosperous future for Ha Nam Province.

Today, when mentioning Ha Nam, it is impossible not to recognize its remarkable progress in renovation, integration, and development. One of the most outstanding achievements of this transformation is the modern transportation infrastructure system, featuring an extensive network of national highways, provincial roads, and district roads, along with dozens of bridges crossing the Red River, Day River, and Chau River, as well as key transportation interchanges.

Investment in the construction of major connecting routes—such as the Liem Son interchange linking National Highway 1A with the Cau Gie – Ninh Binh Expressway and other national highways—while also improving access to important historical and cultural landmarks such as Tran Thuong Temple and the Tran Temple Historical and Cultural Complex, has brought significant benefits to the local community.

Hanoi Vietnam Co., Ltd., one of the leading foundation construction contractors in Vietnam, has been actively participating in these key infrastructure projects. With a highly qualified engineering team and extensive practical experience, we are confident in our ability to contribute effectively to the sustainable development of Ha Nam Province in the years ahead.

Construction Site Images

Construction of Bored Pile Foundations for the Grade-Separated Crossing at National Highway 21A and the Railway – Km16+894.83

Construction of Bored Pile Foundations for the Grade-Separated Crossing at National Highway 21A and the Railway – Km16+894.83

Construction of Bored Pile Foundations for the Grade-Separated Crossing at National Highway 21A and the Railway – Km16+894.83

Construction of Bored Pile Foundations for the Grade-Separated Crossing at National Highway 21A and the Railway – Km16+894.83

Construction of Bored Pile Foundations for the Grade-Separated Crossing at National Highway 21A and the Railway – Km16+894.83

If you require our construction services, please feel free to contact us.

Hotline:
0906 261 755 (Mr. Ngoc);
0988 601 755 (Mr. Henry);
0986 819 020 (Mr. Tung);
0963 601 755 (Ms. Anna)

We look forward to serving our valued clients.

*Liên hệ nhận thông tin và báo giá: https://mayxaydunghanoi.click/

Leave a Reply

Your email address will not be published. Required fields are marked *

0964.601.755